Installation [10/2014 - ]: Procedure
- INSTALL STARTER ASSEMBLY
- Install the starter assembly with the 2 bolts.
Torque: 37 N*m (377 kgf*cm, 27 ft.*lbf)
- Connect the connector.
- Connect the wire harness, install the nut and close the cap.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Install the starter assembly with the 2 bolts.
- INSTALL BATTERY
Refer to PROCEDURE - Step 55
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Refer to PROCEDURE - Step 56
- INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
Refer to PROCEDURE - Step 57
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY
Refer to PROCEDURE - Step 3
- INSTALL INLET NO. 1 AIR CLEANER
Refer to PROCEDURE - Step 54
- INSTALL INLET NO. 2 AIR CLEANER
Refer to PROCEDURE - Step 59
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 82
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 3 and PROCEDURE - Step 3
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [10/2014 - 10/2015] or INITIALIZATION [10/2015 - ] ).