Installation [10/2014 - ]: Procedure
- INSTALL TRANSMISSION OIL COOLER
- Install the transmission oil cooler and transmission oil cooler stay to the front engine mounting bracket with the 3 bolts.
Torque: 14 N*m (138 kgf*cm, 10 ft.*lbf)
- Connect the No. 3 water by-pass hose, No. 4 water by-pass hose, No. 1 oil cooler outlet hose and No. 1 oil cooler inlet hose to the transmission oil cooler and slide the 4 clamps to secure them.
- Install the transmission oil cooler and transmission oil cooler stay to the front engine mounting bracket with the 3 bolts.
- INSTALL INLET NO. 1 AIR CLEANER
Refer to PROCEDURE - Step 54
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Refer to PROCEDURE - Step 56
- INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY
Refer to PROCEDURE - Step 3
- INSTALL INLET NO. 2 AIR CLEANER
Refer to PROCEDURE - Step 59
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 3 and PROCEDURE - Step 3
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 2
- ADD AUTOMATIC TRANSAXLE FLUID
(See step 13)
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1