LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2017 >> Avalon XLE Plus >> Repair and Diagnosis >> Electrical >> Charging Systems >> Charging System (Service Information) (Except Hybrid) >> Generator >> Installation [10/2014 - ] >> Procedure

Installation [10/2014 - ]: Procedure

  1. INSTALL GENERATOR ASSEMBLY 
    1. Install the generator assembly with the 2 bolts.

      Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

    2. Connect the wire harness clamp to the generator bracket.
    3. Install the generator bracket with the 2 bolts.

      Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf) 

    4. Install the wire harness clamp with the bolt.

      Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf) 

    5. Connect the wire harness with the nut.

      Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf) 

    6. Close the terminal cap.
    7. Connect the connector.
  2. INSTALL V-RIBBED BELT 

    (Refer to INSTALLATION [10/2014 - ] ).

  3. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 82

  4. INSTALL RADIATOR ASSEMBLY 

    (Refer to INSTALLATION [10/2014 - ] ).

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [10/2014 - 10/2015] or INITIALIZATION [10/2015 - ] ).