Rear Sunshade Shift-linked Function does not Operate when Shift Lever is Moved to R Position [10/2014 - ]: Procedure
- READ VALUE USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Powertrain / Engine / Data List.
- Read the Data List according to the display on the Techstream.ENGINE
Tester Display Measurement Item/Range Normal Condition Diagnostic Note Shift SW Status (R Range) PNP switch status / ON or OFF ON: Shift lever in R
OFF: Shift lever not in RWhen the shift lever position displayed on the Techstream differs from the actual position, adjustment of the PNP switch or the shift cable may be incorrect. OK
The Techstream display changes according to the shift position selected using the shift lever.
Result:
NG
Refer to SFI SYSTEM
Refer to HOW TO PROCEED WITH TROUBLESHOOTING [10/2014 - ] )
Result:
OK
See step 2
- PERFORM ACTIVE TEST USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Main Body / Active Test.
- Perform the Active Test according to the display on the Techstream.
HINT:
Make sure the rear window shade assembly is raised before performing Active Test.
MAIN BODYTester Display Test Part Control Range Diagnostic Note Reverse Gear Signal Reverse signal OFF/ON - OK
The rear window shade assembly is lowered.
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU)
Refer to REMOVAL [10/2014 - ] )
Result:
NG
See step 3
- CHECK HARNESS AND CONNECTOR (REVERSE SIGNAL)
- Disconnect the J19 rear sunshade relay connector.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition J19-2 (REV) - Body ground Engine switch on (IG), shift lever in any position other than R 11 to 14 V
Result:
OK
REPLACE REAR SUNSHADE RELAY
Refer to REMOVAL [10/2014 - ] )
Result:
NG
See step 4
- INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- Remove the main body ECU (multiplex network body ECU) (Refer to REMOVAL [10/2014 - ]
).TEXT IN ILLUSTRATION
*a Component without harness connected
(Instrument Panel Junction Block Assembly)- - - Disconnect the 3B instrument panel junction block assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 3B-38 - MB-23 (REV) Always Below 1 Ω
Result:
NG
REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
Refer to REMOVAL [10/2014 - ] )
Result:
OK
See step 5
- Remove the main body ECU (multiplex network body ECU) (Refer to REMOVAL [10/2014 - ]
).
- CHECK HARNESS AND CONNECTOR (REAR SUNSHADE RELAY - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 3B-38 - J19-2 (REV) Always Below 1 Ω J19-2 (REV) - Body ground Always 10 kΩ or higher
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU)
Refer to REMOVAL [10/2014 - ] )
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- Measure the resistance according to the value(s) in the table below.