Installation [08/2015 - 08/2019]: Procedure
- INSTALL NAVIGATION ANTENNA ASSEMBLY
- Install the antenna with the 2 screws.
Torque: 2.5 N*m (25 kgf*cm, 22 in.*lbf)
- Attach the clamp.
- Install the antenna with the 2 screws.
- INSTALL DEFROSTER NOZZLE ASSEMBLY
Refer to PROCEDURE - Step 7
- INSTALL NO. 3 HEATER TO REGISTER DUCT
Refer to PROCEDURE - Step 8
- INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT
Refer to PROCEDURE - Step 9
- INSTALL NO. 1 SIDE DEFROSTER NOZZLE DUCT
Refer to PROCEDURE - Step 10
- INSTALL NO. 2 HEATER TO REGISTER DUCT
Refer to PROCEDURE - Step 11
- INSTALL NO. 1 HEATER TO REGISTER DUCT
Refer to PROCEDURE - Step 12
- INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
- Install the instrument panel sub-assembly (Refer to INSTALLATION [08/2015 - 08/2019] ).
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [08/2015 - 08/2019] ).