Inspection [12/2012 - ]: Procedure
WARNING: This page is about a different variant/trim than selected.
- INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Measure the resistance according to the value(s) in the table below.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
*a Component without harness connected
(Park/Neutral Position Switch Assembly)If the result is not as specified, replace the park/neutral position switch assembly.
Standard Resistance
Tester Connection Condition Specified Condition 4 (B) - 9 (L) Shift lever in P Below 1 Ω 1 (RB) - 2 (RL) Shift lever in R Below 1 Ω 4 (B) - 9 (L) Shift lever in N Below 1 Ω 1 (RB) - 7 (DL) Shift lever in D, M, "+" or "-" Below 1 Ω 4 (B) - 9 (L) Shift lever not in R 10 kΩ or higher 1 (RB) - 2 (RL) Shift lever not in R 10 kΩ or higher 4 (B) - 9 (L) Shift lever not in N 10 kΩ or higher 1 (RB) - 7 (DL) Shift lever not in D, M,"+" or "-" 10 kΩ or higher If the result is not as specified, replace the park/neutral position switch assembly.
- Measure the resistance according to the value(s) in the table below.