LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2016 >> Highlander LE Plus, FWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 65 (Engine Cooling System (2GR-FXS) - Service Information - (Hybrid)) >> Thermostat >> Installation [11/2016 - ] >> Procedure

Installation [11/2016 - ]: Procedure

WARNING: This page is about a different car, the 2019 Toyota Highlander, 2018 Toyota Highlander, and 2017 Toyota Highlander. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL WATER INLET WITH THERMOSTAT SUB-ASSEMBLY 
    1. Install a new gasket to the water inlet with thermostat sub-assembly.
    2. Install the water inlet with thermostat sub-assembly with the 2 bolts and 2 nuts.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

  2. CONNECT WATER BY-PASS HOSE 
    1. Connect the water by-pass hose and slide the clip to secure it.
  3. CONNECT NO. 2 RADIATOR HOSE 

    Refer to PROCEDURE - Step 46

  4. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH 
    1. Temporarily install the front No. 1 engine mounting bracket LH with the 7 bolts.
      GTY721129Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Bolt Length

      Item Length
      Bolt (A) 115 mm (4.53 in.)
      Bolt (B) 85 mm (3.35 in.)
      Bolt (C) 40 mm (1.57 in.)
      NOTE:

      Make sure that there is no oil on the threads of the bolts.

    2. Fully tighten the 3 bolts in the order shown in the illustration.
      Fig 1: Tightening Sequence Of Front No. 1 Engine Mounting Bracket LH
      GTY706543Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 54 N*m (551 kgf*cm, 40 ft.*lbf) 

    3. Using SST, fully tighten the bolt.
      GTY723791Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Torque Wrench Fulcrum Length
      • SST: 09961-00950 

      Specified tightening torque 

      Torque: 54 N*m (551 kgf*cm, 40 ft.*lbf) 

      HINT: 

      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Refer to PRECAUTION [11/2016 - ]

      • When using SST (fulcrum length of 150 mm (5.91 in.)) + torque wrench (fulcrum length of 255 mm (10 in.)): 34 N*m (347 kgf*cm, 25 ft.*lbf)
    4. Fully tighten the bolt.
      GTY704122Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 54 N*m (551 kgf*cm, 40 ft.*lbf) 

    5. Using SST, fully tighten the bolt.
      GTY726392Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Torque Wrench Fulcrum Length
      • SST: 09961-00950 

      Specified tightening torque 

      Torque: 54 N*m (551 kgf*cm, 40 ft.*lbf) 

      HINT: 

      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Refer to PRECAUTION [11/2016 - ]

      • When using SST (fulcrum length of 150 mm (5.91 in.)) + torque wrench (fulcrum length of 255 mm (10 in.)): 34 N*m (347 kgf*cm, 25 ft.*lbf)
    6. Using SST, fully tighten the bolt.
      • SST: 09961-00950 

      Specified tightening torque 

      Torque: 54 N*m (551 kgf*cm, 40 ft.*lbf) 

      HINT: 

      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Refer to PRECAUTION [11/2016 - ]

      • When using SST (fulcrum length of 150 mm (5.91 in.)) + torque wrench (fulcrum length of 180 mm (7.09 in.)): 29 N*m (296 kgf*cm, 21 ft.*lbf)
      GTY702299Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Torque Wrench Fulcrum Length
  5. CONNECT ENGINE WIRE 
    1. Connect the engine wire with the bolt.

      Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf) 

  6. INSTALL ENGINE MOVING CONTROL ROD BRACKET 

    Refer to PROCEDURE - Step 39

  7. INSTALL NO. 2 ENGINE MOUNTING STAY RH 

    Refer to PROCEDURE - Step 10

  8. INSTALL RESERVOIR BRACKET 

    Refer to PROCEDURE - Step 41

  9. INSTALL BRAKE MASTER CYLINDER RESERVOIR ASSEMBLY 

    Refer to PROCEDURE - Step 42

  10. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 10

  11. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY 

    Refer to INSTALLATION [02/2014 - ]

  12. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 74

  13. ADD ENGINE COOLANT (for Engine) 

    See step  2

  14. INSPECT FOR COOLANT LEAK (for Engine) 

    Refer to PROCEDURE - Step 1