Installation [12/2013 - 11/2016]: Procedure
- INSTALL OIL COOLER ASSEMBLY
- Clean the installation surfaces of the oil cooler assembly.
- Install a new O-ring to the oil cooler assembly.
- Apply a small amount of engine oil to the oil cooler union bolt.
- Install the oil cooler assembly with the oil cooler union bolt.
Torque: 68 N*m (693 kgf*cm, 50 ft.*lbf)
- Install the No. 4 water by-pass hose and No. 5 water by-pass hose and slide the 4 clips to secure them.
- Engage the 2 clamps to install the 2 hose clamps.
- Install the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH
Refer to INSTALLATION [12/2013 - 11/2016]
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 3
- ADD ENGINE OIL
See step 4
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1
- INSPECT FOR OIL LEAK
See step 5