Installation [12/2013 - 11/2016]: Procedure
- INSTALL GENERATOR ASSEMBLY
- Install the wire harness clamp bracket with the bolt.
Torque: 8.4 N*m (86 kgf*cm, 74 in.*lbf)
- Connect the generator assembly bracket with the wire harness clamp.
- Install generator assembly with the 2 bolts.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Temporarily install the generator assembly bracket with the 2 bolts.
- Fully tighten the generator assembly bracket with the 2 bolts.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- Connect the 3 wire harness clamps.
- Connect the compressor and magnetic clutch connector to the compressor and magnetic clutch.
- Connect the generator assembly connector to the generator assembly.
- Connect the wire harness to terminal B and install the nut.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Install the terminal cap.
- Install the wire harness clamp bracket with the bolt.
- INSTALL V-RIBBED BELT
Refer to INSTALLATION [12/2013 - 11/2016]
- INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE
Refer to PROCEDURE - Step 16
- INSTALL FAN SHROUD
Refer to INSTALLATION [12/2013 - 11/2016]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [12/2013 - 11/2016]