LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2016 >> Highlander Hybrid Limited >> Repair and Diagnosis >> External Pages >> Different car >> Section 56 (Engine Control System (2GR-FXS) - Service Information - (Hybrid)) >> Ignition Coil And Spark Plug >> Installation [11/2016 - ] >> Procedure

Installation [11/2016 - ]: Procedure

WARNING: This page is about a different car, the 2019 Toyota Highlander, 2018 Toyota Highlander, and 2017 Toyota Highlander. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL SPARK PLUG 

    HINT: 

    Perform "Inspection After Repair" after replacing a spark plug.

    Refer to INITIALIZATION [11/2016 - ]

    1. Install the 6 spark plugs to the cylinder head sub-assembly and cylinder head LH.

      Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf) 

      NOTE:

      If a spark plug has been struck or dropped, replace it.

      HINT: 

      Install the same parts to their original positions.

  2. INSTALL IGNITION COIL ASSEMBLY 

    HINT: 

    Perform "Inspection After Repair" after replacing an ignition coil assembly.

    Refer to INITIALIZATION [11/2016 - ]

    1. Install the 6 ignition coil assemblies to the cylinder head cover sub-assembly and cylinder head cover sub-assembly LH with the 6 bolts.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

      NOTE:

      If an ignition coil assembly has been struck or dropped, replace it.

      HINT: 

      Install the same parts to their original positions.

    2. Connect the 6 ignition coil assembly connectors.
  3. INSTALL NO. 1 ENGINE COVER 

    See step  5

  4. INSTALL EGR COOLER ASSEMBLY 

    Refer to INSTALLATION [11/2016 - ]

  5. INSTALL AIR SURGE TANK TO INTAKE MANIFOLD GASKET 

    Refer to PROCEDURE - Step 15

  6. INSTALL INTAKE AIR SURGE TANK ASSEMBLY 

    Refer to PROCEDURE - Step 16

  7. CONNECT PURGE VALVE (PURGE VSV) 

    Refer to PROCEDURE - Step 17

  8. CONNECT VENTILATION HOSE 

    Refer to PROCEDURE - Step 18

  9. INSTALL THROTTLE BODY WITH MOTOR ASSEMBLY 

    Refer to INSTALLATION [11/2016 - ] 

  10. INSTALL V-BANK COVER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 74

  11. PERFORM INITIALIZATION 
    1. Perform "Inspection After Repair" after replacing an ignition coil assembly and spark plug.

      Refer to INITIALIZATION [11/2016 - ]