Power Switch Illumination Circuit [02/2014 - 11/2016]: Procedure
- PERFORM ACTIVE TEST USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the power switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Smart Key / Active Test.
- Perform the Active Test according to the display on the Techstream.
Body Electrical > Smart Key > Active Test
Tester Display Measurement Item Control Range Diagnostic Note Power/Engine SW Light Power switch illumination OFF or ON When performing this Active Test, make sure the following condition is met:
The power switch illumination is off (15 seconds or more have elapsed since it turned from on to off) and the power switch is on (ACC, IG, READY)Body Electrical > Smart Key > Active Test
Tester Display Power/Engine SW Light OK
Power switch illumination comes on.
Result
Proceed to OK NG
Result: 1
OK
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE [02/2014 - ]
Result: 2
NG
See step 2
- INSPECT POWER SWITCH
- Remove the power switch.
Refer to REMOVAL [02/2014 - 11/2016]
- Inspect the power switch.
Refer to INSPECTION [02/2014 - 11/2016]
Result
Proceed to OK NG
Result: 2
NG
REPLACE POWER SWITCH. Refer to REMOVAL [02/2014 - 11/2016]
Result: 1
OK
See step 3
- Remove the power switch.
- CHECK HARNESS AND CONNECTOR (POWER SWITCH - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY))
- Disconnect the F11 certification ECU (smart key ECU assembly) connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition F49-9 (SWIL) - F11-17 (SWIL) Always Below 1 Ω F49-6 (AGND) - F11-13 (AGND) Always Below 1 Ω F49-9 (SWIL) or F11-17 (SWIL) - Body ground Always 10 kΩ or higher F49-6 (AGND) or F11-13 (AGND) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG
Result: 1
OK
REPLACE CERTIFICATION ECU (SMART KEY ECU ASSEMBLY). Refer to REMOVAL [02/2014 - 11/2016]
Result: 2
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR