Installation [12/2012 - ]: Procedure
- INSTALL GENERATOR ASSEMBLY
- Install the generator assembly with the 2 bolts.
Torque: 52 N*m (530 kgf*cm, 38 ft.*lbf)
- Install the wire harness clamp bracket with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the generator wire with the nut.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Install the terminal cap.
- Connect the generator connector.
- Install the generator assembly with the 2 bolts.
- INSTALL WIRE HARNESS CLAMP BRACKET
- Install the wire harness clamp bracket with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Attach the wire harness clamp to the wire harness clamp bracket.
- Install the wire harness clamp bracket with the bolt.
- INSTALL FAN AND GENERATOR V BELT
Refer to INSTALLATION [12/2012 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [12/2012 - 10/2015] , or refer to INITIALIZATION [10/2015 - 08/2016] , or refer to INITIALIZATION [08/2016 - ]