Installation [12/2014 - ]
- INSTALL LIGHT CONTROL RHEOSTAT
- Engage the 2 claws to install the light control rheostat.
- INSTALL NO. 1 SWITCH HOLE BASE . Refer to INSTALLATION [12/2014 - ] - Step 25
- INSTALL UPPER INSTRUMENT PANEL ASSEMBLY
Refer to INSTALLATION [12/2014 - 05/2015]