Interior Light Auto Cut Circuit [10/2014 - ]: Procedure
- PERFORM ACTIVE TEST USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Main Body / Active Test.
- Perform the Active Test according to the display on the Techstream.MAIN BODY
Tester Display Test Part Control Range Diagnostic Note Relay for Interior Light Auto Cut Function DOME CUT relay ON/OFF - ON: DOME CUT relay off (interior lights turn off)
- OFF: DOME CUT relay on (interior lights turn on)
OK
DOME CUT relay operates.
Result:
OK
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE
(Refer to PROBLEM SYMPTOMS TABLE [10/2014 - ] )
Result:
NG
See step 2
- CHECK HARNESS AND CONNECTOR (DOME FUSE - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
- Disconnect the 3D instrument panel junction block assembly connector.
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition 3D-34 - Body ground Always 11 to 14 V
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 3
- REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- Replace the instrument panel junction block assembly (Refer to REMOVAL [10/2014 - ] ).
Result:
NEXT
See step 4
- PERFORM ACTIVE TEST USING TECHSTREAM
- Connect the Techstream to the DLC3.
- Turn the engine switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Body Electrical / Main Body / Active Test.
- Perform the Active Test according to the display on the Techstream.MAIN BODY
Tester Display Test Part Control Range Diagnostic Note Relay for Interior Light Auto Cut Function DOME CUT relay ON/OFF - ON: DOME CUT relay off (interior lights turn off)
- OFF: DOME CUT relay on (interior lights turn on)
OK
DOME CUT relay operates.
Result:
OK
END (INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY WAS DEFECTIVE)
Result:
NG
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU)
(Refer to REMOVAL [10/2014 - ] )