ECM Power Source Circuit [10/2014 - 10/2015]: Procedure
- Check Harness And Connector (ECM - Body Ground)
- Disconnect The ECM Connector.
- Measure The Resistance According To The Value(S) In The Table Below.
Standard Resistance
Tester Connection Condition Specified Condition B51-16 (E1) - Body Ground Always Below 1 Ω
Result:
Ng
Repair Or Replace Harness Or Connector
Result:
Ok
See Step 2
- Check Terminal Voltage (IGSW Voltage)
- Disconnect The ECM Connector.
- Turn The Power Switch On (Ig).
- Measure The Voltage According To The Value(S) In The Table Below.
Standard Voltage
Tester Connection Condition Specified Condition A18-37 (IGSW) - Body Ground Power Switch On (Ig) 11 To 14 V Text In Illustration*A Front View Of Wire Harness Connector
(To ECM)
Result:
Ng
See Step 6
Result:
Ok
See Step 3
- Disconnect The ECM Connector.
- Inspect No. 1 Integration Relay (EFI Main Relay)
- Inspect The No. 1 Integration Relay (EFI Main Relay) (Refer to Inspection [10/2014 - ] ).
Result:
Ng
Replace No. 1 Integration Relay (EFI Main Relay)
(Refer to Removal [10/2014 - ] )
Result:
Ok
See Step 4
- Check Harness And Connector (No. 1 Integration Relay - ECM)
- Remove The No. 1 Integration Relay From The Engine Room Relay Block And Junction Block Assembly.
- Disconnect The ECM Connector.
- Measure The Resistance According To The Value(S) In The Table Below.
Standard Resistance
Tester Connection Condition Specified Condition 1C-9 - A18-2 (+B) Always Below 1 Ω 1C-10 - A18-3 (+B2) Always Below 1 Ω 1C-7 - A18-46 (MREL) Always Below 1 Ω 1C-9 Or A18-2 (+B) - Body Ground Always 10 KΩ Or Higher 1C-10 Or A18-3 (+B2) - Body Ground Always 10 KΩ Or Higher 1C-7 Or A18-46 (MREL) - Body Ground Always 10 KΩ Or Higher
Result:
Ng
Repair Or Replace Harness Or Connector
Result:
Ok
See Step 5
- Check Terminal Voltage (Power Source Of No. 1 Integration Relay)
- Remove The No. 1 Integration Relay From The Engine Room Relay Block And Junction Block Assembly.
- Measure The Voltage According To The Value(S) In The Table Below.
Standard Voltage
Tester Connection Condition Specified Condition 1B-1 - Body Ground Always 11 To 14 V Text In Illustration*A Front View Of Wire Harness Connector
(To No. 1 Integration Relay)
Result:
Ok
Proceed To Next Suspected Area Shown In Problem Symptoms Table
(Refer to Problem Symptoms Table [10/2014 - ] )
Result:
Ng
Repair Or Replace Harness Or Connector (Auxiliary Battery - No. 1 Integration Relay)
- Remove The No. 1 Integration Relay From The Engine Room Relay Block And Junction Block Assembly.
- Inspect No. 1 Integration Relay (Ig2 Relay)
- Inspect The No. 1 Integration Relay (Ig2 Relay) (Refer to Inspection [10/2014 - ] ).
Result:
Ng
Replace No. 1 Integration Relay (Ig2 Relay)
(Refer to Removal [10/2014 - ] )
Result:
Ok
See Step 7
- Check Harness And Connector (No. 1 Integration Relay - ECM)
- Remove The No. 1 Integration Relay From The Engine Room Relay Block And Junction Block Assembly.
- Disconnect The ECM Connector.
- Measure The Resistance According To The Value(S) In The Table Below.
Standard Resistance
Tester Connection Condition Specified Condition 1C-1 - A18-37 (IGSW) Always Below 1 Ω 1C-1 Or A18-37 (IGSW) - Body Ground Always 10 KΩ Or Higher
Result:
Ng
Repair Or Replace Harness Or Connector
Result:
Ok
See Step 8
- Check Terminal Voltage (Power Source Of No. 1 Integration Relay)
- Remove The No. 1 Integration Relay From The Engine Room Relay Block And Junction Block Assembly.
- Measure The Voltage According To The Value(S) In The Table Below.
Standard Voltage
Tester Connection Condition Specified Condition 1D-3 - Body Ground Always 11 To 14 V Text In Illustration*A Front View Of Wire Harness Connector
(To No. 1 Integration Relay)
Result:
Ng
Repair Or Replace Harness Or Connector (Auxiliary Battery - No. 1 Integration Relay)
Result:
Ok
See Step 9
- Remove The No. 1 Integration Relay From The Engine Room Relay Block And Junction Block Assembly.
- Check Harness And Connector (No. 1 Integration Relay - Body Ground)
- Remove The No. 1 Integration Relay From The Engine Room Relay Block And Junction Block Assembly.
- Measure The Resistance According To The Value(S) In The Table Below.
Standard Resistance
Tester Connection Condition Specified Condition 1E-2 - Body Ground Always Below 1 Ω
Result:
Ng
Repair Or Replace Harness Or Connector
Result:
Ok
See Step 10
- Check Harness And Connector (Power Management Control ECU - No. 1 Integration Relay
- Disconnect The Power Management Control ECU Connector.
- Remove The No. 1 Integration Relay From The Engine Room Relay Block And Junction Block Assembly.
- Measure The Resistance According To The Value(S) In The Table Below.
Standard Resistance
Tester Connection Condition Specified Condition A54-2 (Ig2D) - 1C-8 Always Below 1 Ω A54-2 (Ig2D) Or 1C-8 - Body Ground Always 10 KΩ Or Higher
Result:
Ok
Go To Smart Key System
(Refer to How To Proceed With Troubleshooting [10/2014 - 10/2015] )
Result:
Ng
Repair Or Replace Harness Or Connector