Installation [12/2013 - ]
- INSTALL LIGHT CONTROL RHEOSTAT
- Engage the 2 claws to install the light control rheostat.
- INSTALL NO. 1 SWITCH HOLE BASE . Refer to INSTALLATION [12/2013 - ] - Step 26
- INSTALL UPPER INSTRUMENT PANEL ASSEMBLY
Refer to INSTALLATION [12/2013 - ]