Inspection [12/2013 - 11/2016]: Procedure
- INSPECT SHIFT SOLENOID VALVE SL
- Measure the resistance according to the value(s) in the table below.
*a Shift Solenoid Valve SL Standard Resistance
Tester Connection Condition Specified Condition Solenoid Connector (SL) - Solenoid Body (SL) 20°C (68°F) 11 to 15 Ω If the value is not as specified, replace the shift solenoid valve.
- Connect a positive (+) lead from the battery to the terminal of the solenoid connector, and a negative (-) lead to the solenoid body, and check the operation of the valve.NOTE:
When using battery voltage during the inspection, do not bring the positive (+) and negative (-) tester probes too close to each other as a short circuit may occur.
OK
The valve moves and makes an operating sound.
If the operation cannot be done as specified, replace the shift solenoid valve.
- Measure the resistance according to the value(s) in the table below.
- INSPECT SHIFT SOLENOID VALVE (SLT, SLU, SL1, SL2, SL3, SL4)
- Measure the resistance according to the value(s) in the table below.
*a Component without harness connected
(Shift Solenoid Valve SLT, SLU, SL1, SL2, SL3, SL4)Standard Resistance
Tester Connection Condition Specified Condition 1 - 2 20°C (68°F) 5.0 to 5.6 Ω If the value is not as specified, replace the shift solenoid valve.
- Connect a positive (+) lead from the battery with a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid valve connector, and check the operation of the valve.NOTE:
When using battery voltage during the inspection, do not bring the positive (+) and negative (-) tester probes too close to each other as a short circuit may occur.
OK
The valve moves and makes an operating sound.
If the operation cannot be done as specified, replace the shift solenoid valve.
- Measure the resistance according to the value(s) in the table below.