Inspection [11/2016 - ]: Procedure
WARNING: This page is about a different car, the 2019 Toyota Highlander, 2018 Toyota Highlander, and 2017 Toyota Highlander. However, it is still accessible from the selected car via links, so may be relevant.
- INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
- Measure the resistance according to the value(s) in the table below when the transmission control shaft lever is moved to each position.
*a Component without harness connected
(Park/Neutral Position Switch Assembly)Standard Resistance
Tester Connection Condition Specified Condition 1 (RB) - 3 (PL)
4 (B) - 9 (L)Shift lever in P Below 1 Ω Shift lever not in P 10 kΩ or higher 1 (RB) - 2 (RL) Shift lever in R Below 1 Ω Shift lever not in R 10 kΩ or higher 1 (RB) - 8 (NL)
4 (B) - 9 (L)Shift lever in N Below 1 Ω Shift lever not in N 10 kΩ or higher 1 (RB) - 7 (DL) Shift lever in D, S, "+" or "-" Below 1 Ω Shift lever not in D, S, "+" or "-" 10 kΩ or higher If the result is not as specified, replace the park/neutral position switch assembly.
- Measure the resistance according to the value(s) in the table below when the transmission control shaft lever is moved to each position.