Installation [12/2012 - 10/2015]: Procedure
- INSTALL INTAKE AIR CONTROL VALVE ACTUATOR (for TCV)
See step 1
- INSTALL PURGE LINE HOSE
- Install the purge line hose to the intake manifold, and slide the clamp to secure it.
- Connect the purge line hose to the clamp.
- INSTALL CHECK VALVE
- INSTALL UNION TO CONNECTOR TUBE HOSE
- Install the union to connector tube hose to the intake manifold, and slide the clamp to secure it.
- INSTALL INTAKE MANIFOLD
- Install the 2 vacuum hoses to the intake manifold.
*a Condition: Closed Close the tumble control valves.
NOTE:The valves may be damaged if they are not closed before installing the intake manifold.
HINT:
Connect the battery to the terminals of the actuator and operate the motor to close the valves.
Refer to PROCEDURE - Step 3
Install a new gasket to the intake manifold.
Install the intake manifold with the 6 bolts and tighten the bolts in the sequence shown in the illustration.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- CONNECT NO. 2 PCV HOSE
- Connect the No. 2 PCV hose to the intake manifold, and slide the clamp to secure it.
- CONNECT WIRE HARNESS
- Attach the clamp and connect the wire harness.
- Install the bracket with the bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the intake air control actuator connector.
- Install the wire harness clamp bracket with the 2 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Attach the 2 clamps.
- Connect the 2 vacuum hoses and connector and attach the clamp to the vacuum switching valve.
- CONNECT HEATER HOSE
- Connect the outlet heater water hose to the heater radiator unit, and slide the clamp to secure it.
- Connect the inlet heater water hose to the heater radiator unit, and slide the clamp to secure it.
- INSTALL NO. 1 HOSE TO HOSE TUBE
- Install the No. 1 hose to hose tube with the 2 nuts.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- Connect the 2 hoses, and slide the 2 clamps to secure the hoses.
- Install the No. 1 hose to hose tube with the 2 nuts.
- INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY
- Install the outer cowl top panel sub-assembly with the 13 bolts.
Torque: 7.0 N*m (71 kgf*cm, 62 in.*lbf)
- Attach the clamp to the outer cowl top panel sub-assembly.
- Install the outer cowl top panel sub-assembly with the 13 bolts.
- INSTALL WINDSHIELD WIPER MOTOR ASSEMBLY
Refer to INSTALLATION [12/2012 - ]
- INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY
Refer to INSTALLATION [12/2012 - ]
- INSTALL FUEL DELIVERY PIPE
Refer to INSTALLATION [12/2012 - ]
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 3
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1