Installation [08/2017 - ]: Procedure
- INSTALL OIL COOLER ASSEMBLY
- Clean the oil cooler assembly contact surface on the cooler mounting.
- Apply a light coat of engine oil to 2 new oil cooler cover gaskets and a new oil cooler gasket.
- Install the 2 new oil cooler cover gaskets and a new oil cooler gasket to the oil cooler assembly.
- Temporarily install the oil cooler assembly with the union bolt, nut and a new seal washer.
- Tighten the bolt and nut in several steps in the sequence shown in the illustration.
for Union Bolt
Torque: 60 N*m (612 kgf*cm, 44 ft.*lbf)
for Nut
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
*a Seal Washer *b Union Bolt *c Nut
- INSTALL EXHAUST MANIFOLD CONVERTER SUB-ASSEMBLY
Refer to PROCEDURE - Step 9
- ADD ENGINE OIL
See step 4
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 3
- INSPECT ENGINE OIL LEVEL
See step 6
- INSPECT FOR OIL LEAK
See step 5
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1