Installation [12/2012 - ]: Procedure
- INSTALL LIGHT CONTROL RHEOSTAT
- Attach the 2 claws to install the light control rheostat to the fuse box opening cover.
- INSTALL FUSE BOX OPENING COVER
Refer to PROCEDURE - Step 9 [12/2012 - 08/2016] , or refer to PROCEDURE - Step 9 [08/2016 - ]