LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2013 >> RAV4 LE, AWD >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter / Gauge / Display (Service Information) (Except Hybrid) >> Combination Meter >> Installation [12/2012 - ] >> Procedure

Installation [12/2012 - ]: Procedure

  1. INSTALL COMBINATION METER ASSEMBLY 
    1. Connect the 2 connectors.
    2. Attach the 2 clips to install the combination meter assembly.
    3. Install the 2 screws.
  2. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL 

    Refer to PROCEDURE - Step 14 [12/2012 - 10/2015] , or refer to PROCEDURE - Step 14 [10/2015 - ]

  3. INSTALL NO. 3 INSTRUMENT PANEL REGISTER ASSEMBLY 

    Refer to PROCEDURE - Step 17 [12/2012 - 10/2015] , or refer to PROCEDURE - Step 19 [10/2015 - ]

  4. INSTALL CENTER NO. 1 INSTRUMENT CLUSTER FINISH PANEL 

    Refer to PROCEDURE - Step 19 [12/2012 - 10/2015] , or refer to PROCEDURE - Step 21 [10/2015 - ]

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Refer to INITIALIZATION [12/2012 - 10/2015] , or refer to INITIALIZATION [10/2015 - 08/2016] , or refer to INITIALIZATION [08/2016 - ]