LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2013 >> Highlander SE, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 25 (Engine Intake System (1AR-FE) (Service Information) (Except Hybrid)) >> VACUUM SWITCHING VALVE (for ACIS) >> Installation >> Installation

VACUUM SWITCHING VALVE (for ACIS): Installation: Installation

WARNING: This page is about a different variant/trim than selected.
  1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for ACIS) 
    1. Install the vacuum switching valve assembly (for ACIS) with the bolt.
      Fig 1: Identifying Bolt And Vacuum Switching Valve Assembly
      GTY195259Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) 

    2. Connect the 2 vacuum hoses, 2 union to connector tube hoses, clamp and connector.
  2. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY  . Refer to INSTALLATION - Step 89
  3. INSTALL OUTER COWL TOP PANEL SUB-ASSEMBLY  . Refer to INSTALLATION - Step 12
  4. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY  . Refer to INSTALLATION - Step 2
  5. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY  . Refer to INSTALLATION - Step 3
  6. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY RH  . Refer to INSTALLATION - Step 5
  7. INSTALL FRONT WIPER ARM AND BLADE ASSEMBLY LH  . Refer to INSTALLATION - Step 6
  8. INSTALL EJECTOR TUBE  . Refer to INSTALLATION - Step 10