LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2012 >> Sienna XLE, AWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 15 (Automatic Transmission System (U760E) (Service Information)) >> Valve Body Assembly >> Inspection >> Inspection

Valve Body Assembly: Inspection: Inspection

WARNING: This page is about a different variant/trim than selected.
  1. INSPECT SHIFT SOLENOID VALVE SL 
    1. Measure the resistance according to the value(s) in the table below.
      Fig 1: Inspecting Shift Solenoid Valve SL
      GTY298728Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      TEXT IN ILLUSTRATION

      *a Component without harness connected
      (Shift Solenoid Valve SL)

      Standard Resistance

      Tester Connection Condition Specified Condition
      Solenoid Connector - Solenoid Body 20°C (68°F) 11 to 15 Ω
      1. If the result is not as specified, replace the shift solenoid valve SL.
    2. Connect a battery positive (+) lead to the terminal of the solenoid valve connector, and a negative (-) lead to the solenoid body. Then check that the valve moves and makes an operating sound.
      NOTE:

      When using battery voltage during the inspection, do not bring the positive (+) and negative (-) tester probes too close to each other as a short circuit may occur.

      OK

      Valve moves and makes an operating sound.

      1. If the result is not as specified, replace the shift solenoid valve SL.
  2. INSPECT SHIFT SOLENOID VALVE SLT 
    1. Measure the resistance according to the value(s) in the table below.
      Fig 2: Inspecting Shift Solenoid Valve SLT
      GTY296551Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      TEXT IN ILLUSTRATION

      *a Component without harness connected
      (Shift Solenoid Valve SLT)

      Standard Resistance

      Tester Connection Condition Specified Condition
      1 - 2 20°C (68°F) 5.0 to 5.6 Ω

      If the result is not as specified, replace the shift solenoid valve SLT.

    2. Connect a battery positive (+) lead with a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid valve connector. Then check that the valve moves and makes an operating sound.
      NOTE:

      When using battery voltage during the inspection, do not bring the positive (+) and negative (-) tester probes too close to each other as a short circuit may occur.

      OK

      Valve moves and makes an operating sound.

      If the result is not as specified, replace the shift solenoid valve SLT.

  3. INSPECT SHIFT SOLENOID VALVE SLU 

    HINT: 

    Refer to Inspect Shift Solenoid Valve SLT.

  4. INSPECT SHIFT SOLENOID VALVE SL1 

    HINT: 

    Refer to Inspect Shift Solenoid Valve SLT.

  5. INSPECT SHIFT SOLENOID VALVE SL2 

    HINT: 

    Refer to Inspect Shift Solenoid Valve SLT.

  6. INSPECT SHIFT SOLENOID VALVE SL3 

    HINT: 

    Refer to Inspect Shift Solenoid Valve SLT.

  7. INSPECT SHIFT SOLENOID VALVE SL4 

    HINT: 

    Refer to Inspect Shift Solenoid Valve SLT.