DTC P2759: Torque Converter Clutch Pressure Control Solenoid Control Circuit Electrical (Shift Solenoid Valve SLU): Procedure
WARNING: This page is about a different car, the 2010 Toyota Camry. However, it is still accessible from the selected car via links, so may be relevant.
- INSPECT TRANSMISSION WIRE (SLU)
- Remove the TCM from the transaxle.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Specified Condition
20°C (68°F)11 (SLU+) - 5 (SLU-) 5.0 to 5.6 Ω - Measure the resistance according to the value(s) in the table below.
Standard resistance
Check for short
Tester Connection Specified Condition 11 (SLU+) - Body ground 10 kΩ or higher 5 (SLU-) - Body ground 10 kΩ or higher
OK → REPLACE TCM
NG: Go to next step
- INSPECT SHIFT SOLENOID VALVE SLU
- Remove the shift solenoid valve SLU.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Specified Condition
20°C (68°F)1 - 2 5.0 to 5.6 Ω - Connect a positive (+) lead through a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the valve.
OK
The solenoid makes an operating sound.
NG → REPLACE SHIFT SOLENOID VALVE SLU
OK → REPLACE TRANSMISSION WIRE