DTC P0778: Pressure Control Solenoid "B" Electrical (Shift Solenoid Valve SL2): Procedure
WARNING: This page is about a different car, the 2010 Toyota Camry. However, it is still accessible from the selected car via links, so may be relevant.
- INSPECT TRANSMISSION WIRE (SL2)
- Remove the TCM from the transaxle.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Specified Condition
20°C (68°F)9 (SL2+) - 8 (SL2-) 5.0 to 5.6 Ω - Measure the resistance according to the value(s) in the table below.
Standard resistance
Check for short
Tester Connection Specified Condition 9 (SL2+) - Body ground 10 kΩ or higher 8 (SL2-) - Body ground 10 kΩ or higher
OK → REPLACE TCM
NG: Go to next step
- INSPECT SHIFT SOLENOID SL2
- Remove the shift solenoid valve SL2.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
Tester Connection Specified Condition
20°C (68°F)1 - 2 5.0 to 5.6 Ω - Connect a positive (+) lead through a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid valve connector, then check the movement of the valve.
OK
The solenoid makes an operating sound.
NG → REPLACE SHIFT SOLENOID SL2
OK → REPAIR OR REPLACE TRANSMISSION WIRE