DTC P0443: Evaporative Emission Control System Purge Control Valve Circuit: Procedure
WARNING: This page is about a different car, the 2010 Toyota Camry. However, it is still accessible from the selected car via links, so may be relevant.
- PERFORM ACTIVE TEST USING TECHSTREAM
- Disconnect the vacuum hose from the VSV for EVAP.
- Connect the Techstream to the DLC3.
- Start the engine and turn the Techstream on.
- Enter the following menus: Powertrain / Engine / Active Test / Activate the VSV for Evap Control. Press the right or left button.
- Check if air is sucked into the port when operating the VSV for EVAP using the in TECHSTREAM.
Standard
Tester Operation Specified Condition VSV is OFF No air sucked Result
Result Proceed to NG A OK B - Reconnect the vacuum hose.
B → See step 6
A: Go to next step
- INSPECT PURGE VSV
- Disconnect the purge VSV connector.
- Measure the resistance between the terminals of the purge VSV.
Standard resistance
Tester Connection Condition Specified Condition 1 - 2 20°C (68°F) 23 to 26 Ω - Reconnect the purge VSV connector.
NG → See step 7
OK: Go to next step
- INSPECT PURGE VSV (POWER SOURCE VOLTAGE)
- Disconnect the purge VSV connector.
- Turn the ignition switch to ON.
- Measure the voltage between the terminal of the wire harness side connector and body ground.
Standard voltage
Tester Connection Condition Specified Condition C6-1 (Purge VSV) - Body ground Ignition switch ON 11 to 14 V - Reconnect the purge VSV connector.
NG → CHECK HARNESS AND CONNECTOR (PURGE VSV - ENGINE RELAY BLOCK)
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (ECM - PURGE VSV)
- Disconnect the purge VSV connector.
- Disconnect the ECM connector.
- Measure the resistance between the terminals.
Standard resistance (Check for open)
Tester Connection Condition Specified Condition C6-2 (Purge VSV) - C55-108 (PRG) Always Below 1 Ω Standard resistance (Check for short)
Tester Connection Condition Specified Condition C6-2 (Purge VSV) or C55-108 (PRG) - Body ground Always 10 kΩ or higher - Reconnect the ECM connector.
- Reconnect the purge VSV connector.
NG → REPAIR OR REPLACE HARNESS OR CONNECTOR (ECM - PURGE VSV)
OK → See step 5
- REPLACE ECM. Refer to REMOVAL
- CHECK FOR INTERMITTENT PROBLEMS. Refer to CHECK FOR INTERMITTENT PROBLEMS
- REPLACE VACUUM SWITCHING VALVE (PURGE VSV). Refer to REMOVAL