Exhaust Pipe And Catalytic Converter: Installation
- INSTALL AIR FUEL RATIO SENSOR (Bank 1 Sensor 1) (See INSTALLATION )
- INSTALL AIR FUEL RATIO SENSOR (Bank 2 Sensor 1) (See INSTALLATION )
- INSTALL NO. 2 HEATED OXYGEN SENSOR (Bank 1 Sensor 2) (See INSTALLATION )
- INSTALL HEATED OXYGEN SENSOR (Bank 2 Sensor 2) (See INSTALLATION )
- INSTALL FRONT EXHAUST PIPE ASSEMBLY
- Install a new gasket and the front exhaust pipe to the exhaust manifold RH with 3 new nuts.
Torque: 54 N*m (554 kgf*cm, 40 ft.*lbf)
- Connect the air fuel ratio sensor connector.
- Connect the heated oxygen sensor connector.
- Attach the heated oxygen sensor wire harness clamp.
- Install a new gasket and the front exhaust pipe to the exhaust manifold RH with 3 new nuts.
- INSTALL FRONT NO. 2 EXHAUST PIPE ASSEMBLY
- Install a new gasket and the front No. 2 exhaust pipe to the exhaust manifold LH with 3 new nuts.
Torque: 54 N*m (554 kgf*cm, 40 ft.*lbf)
- Connect the air fuel ratio sensor connector.
- Connect the heated oxygen sensor connector.
- Install a new gasket and the front No. 2 exhaust pipe to the exhaust manifold LH with 3 new nuts.
- INSTALL CENTER EXHAUST PIPE ASSEMBLY
- Check the free length.
- Using a vernier caliper, measure the free length of the compression spring.
Minimum free length:
43 mm (1.693 in.)
If the free length is less than the minimum, replace the compression spring.
- Using a vernier caliper, measure the free length of the compression spring.
- Install 2 new gaskets to the front exhaust pipe and front No. 2 exhaust pipe.
- Install the center exhaust pipe to the 3 exhaust pipe supports, and then install the 4 bolts and 2 compression springs.
Torque: for front exhaust pipe
43 N*m (438 kgf*cm, 32 ft.*lbf)
for front No. 2 exhaust pipe
48 N*m (489 kgf*cm, 35 ft.*lbf)
- Check the free length.
- INSTALL EXHAUST PIPE DAMPER
- Install the exhaust pipe damper to the tailpipe with the 2 bolts.
Torque: 19 N*m (194 kgf*cm, 14 ft.*lbf)
- Install the exhaust pipe damper to the tailpipe with the 2 bolts.
- INSTALL TAILPIPE ASSEMBLY
- Install the tailpipe to the 2 exhaust pipe supports.
- Install a new gasket to the center exhaust pipe.
- Connect the tailpipe to the center exhaust pipe.
- Attach a new clamp to the tailpipe and center exhaust pipe. Then install the bolt to the clamp.
Torque: 32 N*m (326 kgf*cm, 24 ft.*lbf)
HINT:
Install the clamp within the angle range shown in the illustration below.
- INSPECT FOR EXHAUST GAS LEAK (See INSTALLATION )
- INSTALL NO. 2 ENGINE UNDER COVER (See INSTALLATION )