Section 9 (Emission Control System (1AR-FE)): Canister: Inspection
WARNING: This page is about a different variant/trim than selected.
- INSPECT CHARCOAL CANISTER ASSEMBLY
- Visually check the charcoal canister for cracks or damage.
If cracks or damage are found, replace the charcoal canister assembly.
- Check charcoal canister operation.
- With the purge port closed, blow 1.10 kPa (11.2 gf/cm2 , 0.16 psi) of air into the vent port, and check that air flows from the air inlet port. If the result is not as specified, replace the charcoal canister assembly.
- With the vent port closed, blow 1.10 kPa (11.2 gf/cm2 , 0.16 psi) of air into the air inlet port, and check that air flows from the purge port. If the result is not as specified, replace the charcoal canister assembly.
- Check for air leakage.
- Connect SST (pressure gauge) to the vent port of the charcoal canister assembly.
SST 09992-00242
- With the purge port and air inlet port closed, apply 20 kPa (150 mmHg, 5.91 in.Hg) of pressurized air into the vent port, then confirm that pressure is retained for 1 minute.
If the result is not as specified, replace the charcoal canister assembly.
- Connect SST (pressure gauge) to the vent port of the charcoal canister assembly.
- Check the canister pump module.
- Remove the canister pump module.
- Check that air flows from port A to port B and C.
If the result is not as specified, replace the charcoal canister assembly.
- Connect the positive (+) lead of the battery to terminal 7 and the negative (-) lead to terminal 6.
- Check that the valve is closed.
If the result is not as specified, replace the charcoal canister assembly.
- Install the canister pump module.
- Visually check the charcoal canister for cracks or damage.