  1. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY 
    1. Install the transmission control cable assembly with the 2 nuts.

      Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf) 

      Fig 1: Locating Transmission Control Cable Assembly With Nuts
      G06012677Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the transmission control cable assembly with the nut.

      Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf) 

      Fig 2: Locating Transmission Control Cable Assembly With Nut
      G06012676Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the 2 transmission control cables to the control cable bracket with 2 new clips*1.
    4. Install the 2 transmission control cables to the transaxle with the 2 clips*2.
      Fig 3: Identifying Control Cable Bracket With Clips
      G06012683Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    5. Rotate the transmission control cable nut counterclockwise approximately 180° and, while holding the nut in that position, press in the stopper until it makes 2 "click" sounds.
      Fig 4: Rotating Transmission Control Cable Nut
      G06012684Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    6. Install the outer part of the transmission control cable to the shift lever retainer, check that the position of the spring is the same as A shown in the illustration, and push in the stopper.

      HINT:

      If the stopper cannot be pushed in, slightly rotate the nut clockwise and then push in the stopper.

      Fig 5: Installing Outer Part Of Transmission Control Cable
      G06012685Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    7. Push the two claws together at the top of the transmission control cable lock piece. While holding the two claws together, push the two lugs on the bottom of the lock piece toward each other and upward to pull out the lock piece.
      Fig 6: Pushing Claws Of Transmission Control Cable Lock Piece
      G06011527Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    8. Install the transmission control shift cable to the shift lever assembly.
    9. Install the control select cable to the shift lever assembly.
      NOTE:
      • Make sure to adjust the length at the neutral shift position.
      • Make sure that the lock piece is protruding from the adjuster case.
      Fig 7: Locating Shift Lever Assembly
      G06012680Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    10. Install the clip to the shift lever assembly.
    11. Press in and lock the lock piece to the adjuster case.
      NOTE: Securely press in the lock piece until the lock engages.
  2. ADJUST TRANSMISSION CONTROL SELECT CABLE  (See ADJUSTMENT )
  3. INSTALL CONSOLE BOX ASSEMBLY  (See INSTALLATION )
  4. INSTALL CONSOLE BOX CARPET  (See INSTALLATION )
  5. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY  (See INSTALLATION )
  6. INSTALL FRONT NO. 1 CONSOLE BOX INSERT  (See INSTALLATION )
  7. INSTALL FRONT NO. 2 CONSOLE BOX INSERT  (See INSTALLATION )
  8. INSTALL INSTRUMENT PANEL BOX ASSEMBLY  (See INSTALLATION )
  9. INSTALL CENTER NO. 1 INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY  (See INSTALLATION )
  10. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY  (See INSTALLATION )
  11. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL LH  (See INSTALLATION )
  12. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL RH  (See INSTALLATION )
  13. INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR 
    1. Install the No. 1 front floor heat insulator with the 3 nuts.

      Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf) 

      Fig 8: Locating No. 1 Front Floor Heat Insulator And Nuts
      G06011533Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  14. INSTALL FRONT EXHAUST PIPE ASSEMBLY  (See INSTALLATION )
  15. INSTALL AIR CLEANER CASE  (See INSTALLATION )
  16. INSTALL AIR CLEANER CAP SUB-ASSEMBLY  (See INSPECTION )
  17. INSTALL BATTERY CARRIER  (See INSTALLATION )
  18. INSTALL BATTERY TRAY 
  19. INSTALL BATTERY  (See INSTALLATION )
  20. INSPECT FOR EXHAUST GAS LEAK 
  21. INSTALL NO. 2 CYLINDER HEAD COVER  (See INSTALLATION )
  22. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See INITIALIZATION ).