LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2009 >> Corolla S, 1.8 L, Standard >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 4 (Engine Cooling System (2AZ-FE)) >> Water Pump >> Installation

Water Pump: Installation

WARNING: This page is about a different variant/trim than selected.
  1. INSTALL WATER PUMP ASSEMBLY 
    1. Remove any old seal packing material from the contact surface.
    2. Apply a continuous line of seal packing as shown in the illustration.

      Seal packing: 

      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent 

      Standard seal diameter: 

      2.2 to 2.5 mm (0.0866 to 0.0984 in.) 

      NOTE:
      • Remove any oil from the contact surface.
      • The parts must be set within 3 minutes after applying seal packing. Otherwise, the material must be removed and reapplied.
      Fig 1: Identifying Seal Packing Applying Area
      G06009285Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the water pump and clamp bracket with the 4 bolts and 2 nuts.

      Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) 

      Fig 2: Identifying Water Pump, Clamp Bracket With Bolts And Nuts
      G06009283Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Confirm that the wire harness of the crankshaft position sensor is secured to the wire harness clamp bracket through the back of the rib of the timing chain cover.
    5. Install the wire harness clamp.
      Fig 3: Locating Crankshaft Position Sensor
      G04975247Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL WATER PUMP PULLEY 
    1. Using SST, install the water pump pulley with the 4 bolts.

      SST 09960-10010 (09962-01000, 09963-00700) 

      Torque: 26 N*m (265 kgf*cm, 19 ft.*lbf) 

  3. INSTALL ENGINE MOUNTING INSULATOR SUB-ASSEMBLY RH  (See INSTALLATION )
  4. INSTALL GENERATOR ASSEMBLY  (See INSTALLATION )
  5. INSTALL V-RIBBED BELT  (See ON-VEHICLE INSPECTION )
    Fig 4: Tightening Water Pump Pulley Bolts
    G04975248Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf) 

  7. ADD ENGINE COOLANT  (See COOLANT )
  8. INSPECT FOR COOLANT LEAK  (See COOLING SYSTEM )
  9. INSPECT RESERVOIR TANK ENGINE COOLANT LEVEL  (See COOLING SYSTEM )
  10. INSTALL ENGINE UNDER COVER LH 
  11. INSTALL ENGINE UNDER COVER RH