Section 4 (Engine Cooling System (2AZ-FE)): Thermostat: Installation
WARNING: This page is about a different variant/trim than selected.
- INSTALL THERMOSTAT
- Install a new gasket onto the thermostat.
- Install the thermostat with the jiggle valve upward.
HINT:
The jiggle valve may be set to within 10° on either side of the indicated position.
- INSTALL WATER INLET
- Install the water inlet with the 2 nuts.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
- Install the water inlet with the 2 nuts.
- CONNECT NO. 2 RADIATOR HOSE (See INSTALLATION )
- ADD ENGINE COOLANT (See COOLANT )
- INSPECT FOR COOLANT LEAK (See COOLING SYSTEM )
- INSPECT RESERVOIR TANK ENGINE COOLANT LEVEL (See COOLING SYSTEM )