Inspection Procedure
WARNING: This page is about a different variant/trim than selected.
- INSPECT SPEED SENSOR INSTALLATION
- Check the speed sensor installation.
OK:
The installation bolt is tightened properly and there is no clearance between the sensor and transaxle case.
NG: REPLACE SPEED SENSOR (NT) (See REMOVAL )
OK: Go to next step
- Check the speed sensor installation.
- INSPECT SPEED SENSOR (NT)
- Disconnect the speed sensor connector from the transaxle.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Condition Specified Condition 1-2 20°C (68°F) 560 to 680 Ω NG: REPLACE SPEED SENSOR (NT) (See REMOVAL )
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (SPEED SENSOR - ECM)
- Connect the speed sensor connector.
- Disconnect the ECM connector.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Condition Specified Condition B31-125 (NT+) - B31-124 (NT-) 20°C (68°F) 560 to 680 Ω - Measure the resistance according to the value(s) in the table below.
Standard resistance (Check for short)
TESTER CONNECTION SPECIFIED CONDITION CHARTTester Connection Condition Specified Condition B31-125 (NT+) - Body ground Always 10 kΩ or higher B31-124 (NT-) - Body ground Always ↑ NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE ECM (for 2ZR-FE) (See REMOVAL )