Power Steering Link: Installation
- INSTALL POWER STEERING RACK HOUSING HEAT INSULATOR (for 2GR-FE)
- Install the power steering rack housing heat insulator to the power steering link assembly.
- INSTALL POWER STEERING LINK ASSEMBLY
- Install the power steering link assembly with the 2 bolts and 2 nuts.
Torque: 70 N*m (714 kgf*cm, 52 ft.*lbf)
- Install the power steering link assembly with the 2 bolts and 2 nuts.
- CONNECT PRESSURE FEED TUBE ASSEMBLY
- Temporarily connect the pressure feed tube assembly to the power steering link assembly.
- Install the pressure feed tube assembly clamp with the 2 bolts.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Using SST, tighten the pressure feed tube assembly (pressure feed tube side).
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
SST 09023-12701
Torque:
Without SST
25 N*m (250 kgf*cm, 18 ft.*lbf)
With SST
22 N*m (227 kgf*cm, 16 ft.*lbf)
NOTE:- Use a torque wrench with a fulcrum length of 300 mm (11.81 in.).
- This torque value is effective when SST is parallel to the torque wrench.
- Using SST, tighten the pressure feed tube assembly (return tube side).
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
SST 09023-12701
Torque:
Without SST
25 N*m (250 kgf*cm, 18 ft.*lbf)
With SST
22 N*m (227 kgf*cm, 16 ft.*lbf)
NOTE:- Use a torque wrench with a fulcrum length of 300 mm (11.81 in.)-
- This torque value is effective when SST is parallel to a torque wrench.
- INSTALL ENGINE ASSEMBLY WITH TRANSAXLE
HINT:
Refer to the instructions for installation of the engine assembly (See INSTALLATION for 2A2-FE, INSTALLATION for 2GR-FE).
- CONNECT TIE ROD ASSEMBLY LH
- Connect the tie rod assembly LH to the steering knuckle with the nut.
Torque: 49 N*m (500 kgf*cm, 36 ft.*lbf)
- Install a new cotter pin.
NOTE: Further tighten the nut up to 60° if the holes for the cotter pin are not aligned. - Connect the tie rod assembly LH to the steering knuckle with the nut.
- CONNECT TIE ROD ASSEMBLY RH
HINT:
Perform the same procedure on the other side.
- CONNECT STEERING SLIDING YOKE
- Align the matchmarks on the steering sliding yoke and the steering link assembly.
- Install the bolt.
Torque: 35 N*m (360 kgf*cm, 26 ft.*lbf)
- INSTALL FRONT WHEELS
Torque: 103 N*m (1,050 kgf*cm, 76 ft.*lbf)
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- BLEED POWER STEERING FLUID (See BLEEDING )
- CHECK POWER STEERING FLUID LEVEL (See ON-VEHICLE INSPECTION )
- CHECK FOR POWER STEERING FLUID LEAKAGE
- CHECK FOR EXHAUST GAS LEAKS
- PLACE FRONT WHEELS FACING STRAIGHT AHEAD
- INSPECT AND ADJUST FRONT WHEEL ALIGNMENT
HINT:
(See ADJUSTMENT )