LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2009 >> Camry Base, Automatic >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Meter (Except Hybrid) >> Meter / Gauge System >> Entire Combination Meter does not Operate >> Inspection Procedure

Inspection Procedure

  1. INSPECT COMBINATION METER ASSEMBLY 
    1. Disconnect the F1 connector.
    2. Measure the resistance according to the value(s) in the table below.

      Standard resistance 

      RESISTANCE SPECIFICATION

      Tester Connection Condition Specified Condition
      F1-12 (E2) - Body ground Always Below 1 Ω
      F1-24 (ES) - Body ground Always Below 1 Ω
    3. Measure the voltage according to the value(s) in the table below.

      Standard voltage 

      VOLTAGE SPECIFICATION

      Tester Connection Condition Specified Condition
      F1-13 (IG+) - Body ground Turn the ignition switch on (IG) 10 to 14 V
      F1-1 (B2) - Body ground Always 10 to 14 V
      F1-2 (B) - Body ground Always 10 to 14 V
      Fig 1: Identifying Combination Meter Connector Terminals
      G04980537Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    NG: REPAIR OR REPLACE HARNESS OR CONNECTOR 

    OK: REPLACE COMBINATION METER ASSEMBLY