LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2008 >> FJ Cruiser RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 237 (Automatic Transmission - U340E) >> Park / Neutral Position Switch >> Installation

Park / Neutral Position Switch: Installation

WARNING: This page is about a different car, the 2008 Toyota Yaris. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY 
    1. Install the park/neutral position switch assembly onto the manual transaxle.
    2. Fig 1: Identifying Bolts And Park/Neutral Position Switch Assembly
      G04831095Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Provisionally install the 2 bolts.
    4. Replace the lock plate with a new one and tighten the manual valve shaft nut.

      Torque: 6.9 N*m (70 kgf*cm, 61 in.*lbf) 

      Fig 2: Identifying Lock Plate
      G04831101Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    5. Provisionally install the control shaft lever.
    6. Turn the lever counterclockwise until it stops, then turn it clockwise 2 notches.
    7. Fig 3: Identifying Turning Lever Counterclockwise
      G04831102Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    8. Remove the control shaft lever.
    9. Align the groove with the neutral basic line.
    10. Fig 4: Identifying Groove With Neutral Basic Line
      G05590972Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    11. Hold the switch in this position and tighten the 2 bolts.

      Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf) 

    12. Using a screwdriver, stake the nut with the lock plate.
      Fig 5: Identifying Staking Nut With Lock Plate
      G04831104Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    13. Install the control shaft lever with the nut and washer.

      Torque: 13 N*m (130 kgf*cm, 9 ft.*lbf) 

      Fig 6: Identifying Control Shaft Lever With Nut And Washer
      G04831093Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    14. Connect the connector to the park/neutral position switch assembly.
  2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY 
    1. Install the transmission control cable onto the control shaft lever with the nut.

      Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf) 

      Fig 7: Identifying Nut And Clip
      G04831092Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the transmission control cable into the bracket with the new clip.
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf) 

  4. ADJUST SHIFT LEVER POSITION (See  ADJUSTMENT   ) 
  5. INSPECT SHIFT LEVER POSITION (See  ON-VEHICLE INSPECTION   ) 
  6. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY (See  ON-VEHICLE INSPECTION   ) 
  7. INSTALL ENGINE UNDER COVER LH