Floor Shift Assembly: Installation
WARNING: This page is about a different car, the 2008 Toyota Yaris. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL FLOOR SHIFT ASSEMBLY
- Provisionally install the shift lever with the 4 bolts.NOTE: Do not jam the wiring of the indicator light or shift lock.
- Tighten the 4 bolts in order, from A to D.
Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf)
- Install the shift lock control computer connector and indicator light connector.
- Provisionally install the shift lever with the 4 bolts.
- CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
- Turn the nut of the control cable and push in the lock.
- Install the control cable onto the shift lever retainer.
- Connect the control cable to the shift lever.
- INSPECT SHIFT LEVER POSITION (See ON-VEHICLE INSPECTION )
- ADJUST SHIFT LEVER POSITION (See ADJUSTMENT )
- INSTALL REAR CONSOLE BOX ASSEMBLY (See INSTALLATION )
- INSTALL CONSOLE BOX CARPET (See INSTALLATION )
- INSTALL REAR CONSOLE BOX COVER (for Hatchback) (See INSTALLATION )
- INSTALL REAR UPPER CONSOLE PANEL SUBASSEMBLY (for Sedan) (See INSTALLATION )
- INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY (for Sedan) (See INSTALLATION )
- INSTALL CENTER LOWER INSTRUMENT PANEL FINISH PANEL (for Sedan) (See INSTALLATION )
- INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY
- Install the shift lever knob sub-assembly onto the shift lever.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)