LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2008 >> FJ Cruiser RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 227 (Engine Control System (2AZ-FE)) >> Camshaft Timing Oil Control Valve Assembly >> Installation

Camshaft Timing Oil Control Valve Assembly: Installation

WARNING: This page is about a different car, the 2008 Toyota RAV4. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY 
    1. Apply a light coat of engine oil to the O-ring of the oil control valve.
      Fig 1: Identifying O-Ring
      G05183804Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the oil control valve with the bolt.

      Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) 

      NOTE: Make sure that the O-ring is not cracked or jammed.
      Fig 2: Identifying Oil Control Valve Bolts
      G04973348Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Connect the oil control valve connector.
  2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
  3. CHECK FOR ENGINE OIL LEAKS 
    1. Start the engine, and check that there are no oil leaks.
  4. INSTALL NO. 1 ENGINE COVER  (See INSTALLATION  )