ROOF DRIP SIDE FINISH MOLDING (for Sedan): Installation
WARNING: This page is about a different car, the 2008 Toyota Yaris. However, it is still accessible from the selected car via links, so may be relevant.
HINT:
The procedure described below is for LH side. Use the same procedure for both the RH and LH sides, unless otherwise specified.
- INSTALL ROOF DRIP SIDE FINISH MOLDING CLIP NOTE: Follow these procedures only when replacing the clips.
- Remove the tape that remains on the molding surface of the vehicle body, then clean the surface with a non-residue solvent.
- Using an infrared light, heat the clip installation surface of the vehicle body.
Heating Temperature
HEATING TEMPERATURE CHARTArea Temperature Vehicle Body 40 to 60°C (104 to 140°F) NOTE: Do not excessively heat the vehicle body. - Install new clips in the positions shown in the illustration. Press in the clips by hand.
Specification
AREA MEASUREMENT CHARTArea Measurement a 3.5 mm (0.138 in.) b 1.1 mm (0.043 In.) c 1.8 mm (0.071 In.) d 2.3 mm (0.091 In.) NOTE: After pressing in the clips, wait 30 minutes or more before installing the roof drip side finish molding.HINT:
- Minimum hardening time: 30 minutes
- Time needed for complete hardening: 24 hours
- INSTALL ROOF DRIP SIDE FINISH MOLDING
- Engage the 2 clips and install the roof drip side finish molding.
- Remove the protective tape.