LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2008 >> FJ Cruiser RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 143 (Automatic Transmission - A750F) >> Floor Shift Assembly >> Installation

Floor Shift Assembly: Installation

WARNING: This page is about a different car, the 2007 Toyota Land Cruiser. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL FLOOR SHIFT LEVER ASSEMBLY 
    1. Install the floor shift lever assembly with the 6 bolts.

      Torque: 8.3 N*m (85 kgf*cm, 73 in.*lbf) 

    2. Connect the connector to the floor shift lever assembly.
    Fig 1: Locating Floor Shift Lever Assembly Bolts
    G05197145Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY 
    1. Shift into the N position.
    2. Connect the No. 1 floor shift gear shifting rod and connecting rod swivel with the nut.

    Torque: 13 N*m (130 kgf*cm, 9 ft.*lbf) 

  3. INSTALL CONSOLE PANEL SUB-ASSEMBLY UPPER 
    1. Install console panel sub-assembly upper (see INSTALLATION ).
    Fig 2: Locating Floor Shift Gear Shifting Rod Nut
    G05197144Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  4. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY