LEMON Manuals: Even more car manuals for everyone
Home >> Toyota >> 2008 >> FJ Cruiser RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 141 (Engine Control System (2GR-FE)) >> Camshaft Timing Oil Control Valve Assembly >> Installation

Camshaft Timing Oil Control Valve Assembly: Installation

WARNING: This page is about a different car, the 2007 Toyota RAV4. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY 
    1. Apply a light coat of engine oil to new 4 O-rings of the oil control valves.
    2. Install the O-rings to the 4 oil control valves.
      Fig 1: Identifying Camshaft Timing Oil Control Valve O-Ring
      G05183804Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the 4 oil control valves with the 4 bolts.

      Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf) 

      NOTE: Make sure that the O-ring is not cracked or jammed.
    4. Connect the 4 oil control valve connectors.
  2. INSTALL INTAKE AIR SURGE TANK ASSEMBLY  (see INSTALLATION )
  3. CHECK FOR ENGINE OIL LEAKS 
    1. Start the engine, and check that there are no oil leaks.
    Fig 2: Locating Oil Control Valves Bolts
    G00514513Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002