Automatic Transaxle Assembly: Installation
- INSTALL TORQUE CONVERTER CLUTCH ASSEMBLY
- Install the torque converter clutch to the automatic transaxle assembly.
- Using vernier calipers, measure dimension "A" between the transaxle fitting part of the engine and the converter fitting part of the drive plate (procedure "I").
- Using vernier calipers and a straight edge, measure dimension "B" shown in the illustration and check that "B" is greater than "A" measured in procedure "I".
Standard:
A + 1 mm (0.04 in.) or more
NOTE: Remember to subtract the thickness of the straight edge.
- INSTALL AUTOMATIC TRANSAXLE ASSEMBLY
- Install the automatic transaxle assembly to the engine with the 6 bolts.
Torque:
Bolt A
64 N*m (653 kgf*cm, 47 ft.*lbf)
Bolt B
46 N*m (469 kgf*cm, 34 ft.*lbf)
Bolt C
23 N*m (235 kgf*cm, 17 ft.*lbf)
- Install the 6 torque converter mounting bolts.
Torque: 28 N*m (286 kgf*cm, 21 ft.*lbf)
HINT:
First install the yellowish green colored bolt and then the remaining 5 bolts.
- Install the automatic transaxle assembly to the engine with the 6 bolts.
- INSTALL FLYWHEEL HOUSING UNDER COVER
- INSTALL REAR ENGINE MOUNTING BRACKET
- Install the rear engine mounting bracket to the automatic transaxle assembly with the 3 bolts.
Torque: 64 N*m (653 kgf*cm, 47 ft.*lbf)
- Install the rear engine mounting bracket to the automatic transaxle assembly with the 3 bolts.
- INSTALL FRONT ENGINE MOUNTING BRACKET
- Install the front engine mounting bracket to the automatic transaxle assembly with the 2 bolts.
Torque: 64 N*m (653 kgf*cm, 47 ft.*lbf)
- Install the front engine mounting bracket to the automatic transaxle assembly with the 2 bolts.
- INSTALL CENTER ENGINE MOUNTING MEMBER SUB-ASSEMBLY
- Install the dynamic damper, center engine mounting member sub-assembly with front engine mounting insulator with the 4 bolts.
Torque:
Bolt A
52 N*m (530 kgf*cm, 38 ft.*lbf)
Bolt B
60 N*m (612 kgf*cm, 44 ft.*lbf)
- Install the front engine mounting insulator to the front engine mounting bracket with the bolt and nut.
Torque: 52 N*m (530 kgf cm, 38 ft.*lbf)
- Install the dynamic damper, center engine mounting member sub-assembly with front engine mounting insulator with the 4 bolts.
- INSTALL REAR ENGINE MOUNTING INSULATOR
- Install the rear engine mounting insulator to the rear engine mounting bracket with the bolt.
Torque: 65 N*m (663 kgf*cm, 48 ft.*lbf)
- Tighten the 3 nuts and bolt.
Torque: 52 N*m (530 kgf*cm, 38 ft.*lbf)
- Install the rear engine mounting insulator to the rear engine mounting bracket with the bolt.
- INSTALL ENGINE MOUNTING BRACKET LH
- Install the engine mounting bracket LH to the automatic transaxle assembly with the 3 bolts.
Torque: 52 N*m (530 kgf*cm, 38 ft.*lbf)
- Install the engine mounting bracket LH to the automatic transaxle assembly with the 3 bolts.
- INSTALL ENGINE MOUNTING INSULATOR LH
- Install the engine mounting insulator to the body LH with the 4 bolts.
Torque: 52 N*m (530 kgf*cm, 38 ft.*lbf)
- Install the engine mounting insulator LH to the engine mounting bracket LH with the through bolt and nut.
Torque: 80 N*m (816 kgf*cm, 59 ft.*lbf)
- Install the engine mounting insulator to the body LH with the 4 bolts.
- INSTALL STARTER ASSEMBLY
- Install the starter with the 2 bolts.
Torque: 39 N*m (398 kgf*cm, 29 ft.*lbf)
- Connect the starter connector.
- Install the starter wire and nut.
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
- Close the terminal cover.
- Install the starter with the 2 bolts.
- INSTALL AUTOMATIC TRANSMISSION CASE PROTECTOR
- Install the case protector with the 2 bolts.
Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf)
- Install the case protector with the 2 bolts.
- INSTALL FRONT DRIVE SHAFT ASSEMBLY LH (See INSTALLATION )
- INSTALL FRONT DRIVE SHAFT ASSEMBLY RH (See INSTALLATION )
- INSTALL FRONT EXHAUST PIPE ASSEMBLY (See INSTALLATION )
- INSTALL ENGINE UNDER COVER LH
- INSTALL ENGINE UNDER COVER RH
- INSTALL FRONT WHEELS
Torque: 103 N*m (1050 kgf*cm, 76 ft.*lbf)
- INSTALL OXYGEN SENSOR CONNECTOR
- Connect the oxygen sensor connector.
- Install the floor carpet and foot rest.
- INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY
- Temporarily install the No. 1 oil cooler outlet tube.
- Temporarily install the No. 1 oil cooler inlet tube.
- Coat a new O-ring with ATF, and install it to the oil filler tube sub-assembly.
- Install the oil filler tube sub-assembly to the automatic transaxle assembly.
- Install the oil cooler tube clamp with the 2 bolts.
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
- Install the ATF level gauge.
- INSTALL NO. 1 OIL COOLER OUTLET TUBE
- Using SST, tighten the No. 1 oil cooler outlet tube.
SST 09023-38400
Torque:
For use without SST
35 N*m (357 kgf*cm, 26 ft.*lbf)
For use with SST
32 N*m (326 kgf*cm, 24 ft.*lbf)
- Using SST, tighten the No. 1 oil cooler outlet tube.
- INSTALL NO. 1 OIL COOLER INLET TUBE
- Using SST, tighten the No. 1 oil cooler inlet tube.
SST 09023-38400
Torque:
For use without SST
35 N*m (357 kgf*cm, 26 ft.*lbf)
For use with SST
32 N*m (326 kgf*cm, 24 ft.*lbf)
- Using SST, tighten the No. 1 oil cooler inlet tube.
- CONNECT CONNECTOR
- Connect the transmission wire connector.
- Connect the park/neutral position switch connector.
- w/o ABS:
Connect the speedometer sensor connector.
- INSTALL WIRE HARNESS
- Install the wire harness clamp bracket with the bolt.
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
- Install the wire harness clamp bracket and 2 wire harnesses with the 3 bolts.
Torque:
Bolt A
26 N*m (265 kgf*cm, 19 ft.*lbf)
Bolt B
10 N*m (102 kgf*cm, 7 ft.*lbf)
Bolt C
13 N*m (133 kgf*cm, 10 ft.*lbf)
- Install the wire harness clamp bracket with the bolt.
- INSTALL NO. 1 TRANSMISSION CONTROL CABLE BRACKET
- Install the control cable bracket with the 2 bolts.
Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf)
- Install the control cable bracket with the 2 bolts.
- INSTALL TRANSMISSION CONTROL CABLE SUPPORT
- Install the control cable support with the bolt.
Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf)
- Connect the control cable and wire harness to the control cable support.
- Install the control cable support with the bolt.
- INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
- Temporarily install the control cable to the control shaft lever with the nut.
- Install the control cable and a new clip to the bracket.
- INSTALL BATTERY CARRIER
- Install the battery carrier with the 4 bolts.
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
- Install the battery carrier with the 4 bolts.
- INSTALL BATTERY
- INSTALL AIR CLEANER ASSEMBLY WITH HOSE
Torque: 7.0 N*m (71 kgf*cm, 62 in.*lbf)
- INSTALL NO. 2 CYLINDER HEAD COVER
Torque: 7.0 N*m (71 kgf*cm, 62 in.*lbf)
- INSTALL HOOD SUB-ASSEMBLY
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
- INSPECT HOOD SUB-ASSEMBLY (See ADJUSTMENT )
- ADJUST HOOD SUB-ASSEMBLY (See ADJUSTMENT )
- ADD AUTOMATIC TRANSAXLE FLUID
Fluid type:
T-IV
Capacity:
3.0 liters (3.2 US qts, 2.6 lmp.qts)
- INSPECT AUTOMATIC TRANSAXLE FLUID
HINT:
- ADJUST SHIFT LEVER POSITION (See ADJUSTMENT )
- INSPECT SHIFT LEVER POSITION (See ADJUSTMENT )
- INSPECT FRONT WHEEL ALIGNMENT
HINT:
See ADJUSTMENT
- CHECK ABS SPEED SENSOR SIGNAL (w/ABS)
HINT:
- w/VSC (See TEST MODE PROCEDURE )
- w/o VSC (See TEST MODE PROCEDURE )
- RESET MEMORY
HINT:
See INITIALIZATION