Section 10 (Starting System (2GR-FE)): Starter: Installation
WARNING: This page is about a different variant/trim than selected.
- INSTALL STARTER ASSEMBLY
- Install the starter assembly with the 2 bolts.
Torque: 37 N*m (380 kgf*cm, 28 ft.*lbf)
- Connect the wire harness to terminal 30 and install the nut. Then, attach the terminal cap.
Torque: 9.8 N*m (100 kgf*cm, 87 in.*lbf)
- Connect the terminal 50 connector to the starter assembly.
- Install the starter assembly with the 2 bolts.
- INSTALL NO. 1 AIR CLEANER INLET (See INSTALLATION )
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER INLET ASSEMBLY (See INSTALLATION )
- INSTALL V-BANK COVER SUB-ASSEMBLY (See INSTALLATION )
- INSTALL COOL AIR INTAKE DUCT SEAL (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL (See INSTALLATION )