Inspection Procedure
- PERFORM ACTIVE TEST BY TECHSTREAM
- Connect Techstream to the DLC3.
- Turn the ignition switch on (IG).
- Turn Techstream on.
- Select the following menu items: Body Electrical / Main Body / Active Test.
- Check that the relay operates.
Main Body:
DATA LIST REFERENCETester Display Test Part Control Range Diagnostic Note Head Light (Hi) HI-beam headlight relay ON/OFF - OK:
Relay operates. (HI-beam headlights illuminate.)
OK: PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
NG: Go to next step
- INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- Measure the voltage according to the value(s) in the table below.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition ID-3 (HRLY) - Body ground Light control switch OFF → HEAD 10 to 14 V → Below 1 V ID-9 (DRL) - Body ground Light control switch in HEAD, dimmer switch LOW → HIGH 10 to 14 V → Below 1 V
OK: Go to step 6
NG: Go to next step
- Measure the voltage according to the value(s) in the table below.
- CHECK HARNESS AND CONNECTOR (ENGINE ROOM J/B ASSEMBLY - BATTERY AND BODY GROUND)
- Disconnect the 1G engine room J/B assembly connector.
- Measure the voltage according to the value(s) in the table below.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition 1G-1 - Body ground Always 10 to 14 V - Disconnect the 1E engine room J/B assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
RESISTANCE REFERENCETester Connection Condition Specified Condition 1E-11 - Body ground Always Below 1 Ω
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- INSPECT ENGINE ROOM JUNCTION BLOCK ASSEMBLY
- Reconnect the 1G and 1E engine room J/B assembly connectors.
- Disconnect the 1D engine room J/B assembly connector.
- Measure the voltage according to the value(s) in the table below.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition 1D-8 - Body ground Always 10 to 14 V 1D-9 - Body ground Always 10 to 14 V
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
NG: REPLACE ENGINE ROOM JUNCTION BLOCK ASSEMBLY (POWER DISTRIBUTOR)
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (ENGINE ROOM J/B ASSEMBLY - INSTRUMENT PANEL J/B ASSEMBLY)
- Reconnect the 1D engine room J/B assembly connector.
- Disconnect the ID instrument panel J/B connector.
- Measure the voltage according to the value(s) in the table below.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition ID-3 (HRLY) - Body ground Always 10 to 14 V ID-9 (DRL) - Body ground Always 10 to 14 V
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- CHECK HARNESS AND CONNECTOR (SHORT IN RELAY-DRIVEN CIRCUIT)
- Remove the H-LP (RH) fuse from the engine room J/B assembly.
- Turn the light control switch to the HEAD position and turn the dimmer switch to the HIGH position.
- Check if the high beam headlight LH illuminates.
- Turn the dimmer switch to the LOW position.
- Install the H-LP (RH) fuse and remove the H-LP (LH) fuse.
- Turn the dimmer switch to the HIGH position.
- Check if the high beam headlight RH illuminates.
OK:
Either high beam headlight LH or RH illuminates.
OK: REPAIR OR REPLACE HARNESS OR CONNECTOR (SHORT CIRCUIT BETWEEN FUSE AND BULB)
NG: Go to next step
- INSPECT ENGINE ROOM JUNCTION BLOCK ASSEMBLY
- Remove the H-LP (RH) fuse and H-LP (LH) fuse from the engine room J/B assembly.
- Measure the voltage between the loading slot of each fuse and body ground.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition H-LP (RH) Terminal - Body ground Light control switch in HEAD and dimmer switch in HIGH 10 to 14 V H-LP (LH) Terminal - Body ground Light control switch in HEAD and dimmer switch in HIGH 10 to 14 V
NG: REPLACE ENGINE ROOM JUNCTION BLOCK ASSEMBLY (POWER DISTRIBUTOR)
OK: REPAIR OR REPLACE HARNESS OR CONNECTOR (OPEN CIRCUIT BETWEEN FUSE AND BODY GROUND)