Inspection Procedure
- PERFORM ACTIVE TEST BY TECHSTREAM
- Connect Techstream to the DLC3.
- Turn the ignition switch on (IG).
- Turn Techstream on.
- Select the following menu items: Body Electrical / Main Body / Active Test.
- Check that the relay operates.
Main Body:
DATA LIST REFERENCETester Display Test Part Control Range Diagnostic Note Front Fog Light Relay Front fog light relay ON/OFF - OK:
Front fog light relay operates. (Front fog lights come on.)
OK: PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE
NG: Go to next step
- INSPECT FUSE (FR FOG)
- Remove the FR FOG fuse from the instrument panel J/B assembly.
- Measure the resistance of the fuse.
Standard resistance:
Below 1 Ω
NG: REPLACE FUSE
OK: Go to next step
- INSPECT FOG LIGHT RELAY
- Remove the front fog light relay from the instrument panel J/B assembly.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
RESISTANCE REFERENCETester Connection Specified Condition 3 - 5 10 kΩ or higher Below 1 Ω (When battery voltage is applied to terminals 1 and 2)
NG: REPLACE FOG LIGHT RELAY
OK: Go to next step
- INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- Measure the voltage according to the value(s) in the table below.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition IC-1 - Body ground Light control switch in HEAD, front fog light switch OFF → ON Below 1 V → 10 to 14 V ID-5 - Body ground Light control switch in HEAD, front fog light switch OFF → ON Below 1 V → 10 to 14 V
OK: REPAIR OR REPLACE HARNESS OR CONNECTOR (INSTRUMENT PANEL J/B ASSEMBLY - BODY GROUND)
NG: Go to next step
- Measure the voltage according to the value(s) in the table below.
- INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- Measure the voltage according to the value(s) in the table below.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition IL-3 - Body ground Light control switch OFF → TAIL Below 1 V → 10 to 14 V
NG: REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
OK: Go to next step
- Measure the voltage according to the value(s) in the table below.
- CHECK HARNESS AND CONNECTOR (BETWEEN CONNECTOR IL-3 AND CONNECTOR IL-4)
- Measure the voltage according to the value(s) in the table below.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition IL-4 - Body ground Light control switch OFF → TAIL Below 1 V → 10 to 14 V
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: Go to next step
- Measure the voltage according to the value(s) in the table below.
- INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
- Disconnect the II instrument panel J/B assembly connector.
- Measure the voltage according to the value(s) in the table below.
Standard voltage
VOLTAGE SPECIFICATIONTester Connection Condition Specified Condition II-8 - Body ground Light control switch OFF → TAIL Below 1 V → 10 to 14 V
NG: REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
OK: Go to next step
- CHECK HARNESS AND CONNECTOR (BODY ECU - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
- Disconnect the E7 main body ECU connector.
- Measure the resistance according to the value(s) in the table below.
Standard resistance
RESISTANCE REFERENCETester Connection Condition Specified Condition E7-4 - II-8 Always Below 1 Ω
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
OK: REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY