Engine Cooling System (Hybrid): Thermostat: Installation
- INSTALL THERMOSTAT
- Install a new gasket to the thermostat.
- Align the jiggle valve of the thermostat and water inlet, and insert the thermostat in the water inlet housing.
HINT:
The jiggle valve should be set within +-15° from the prescribed position.
- INSTALL WATER INLET
- Install the 3 nuts and the water inlet.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Install the 3 nuts and the water inlet.
- INSTALL WATER INLET PIPE
- Install a new O-ring to the water inlet pipe.
- Apply soapy water to the O-ring.
- Connect the water inlet pipe to the water inlet.
- Install the bolt which is used to fix the water inlet pipe to the cylinder head with the bolt.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- INSTALL W/CONVERTER INVERTER ASSEMBLY (See INSTALLATION )
- INSTALL INVERTER BRACKET NO.4 (See INSTALLATION )
- INSTALL ENGINE ROOM RELAY BLOCK ASSEMBLY (See INSTALLATION )
- REMOVE INVERTER COVER (See INSTALLATION )
- CONNECT NO.3 WIRE FRAME (See INSTALLATION )
- CONNECT MG ECU CONNECTOR (See INSTALLATION )
- CONNECT HIGH VOLTAGE CABLE OF FRONT MOTOR (See INSTALLATION )
- CONNECT ENGINE WIRE NO.4 (See INSTALLATION )
- CHECK HIGH VOLTAGE CABLE CONNECTION (See INSTALLATION )
- INSTALL INVERTER COVER (See INSTALLATION )
- INSTALL POWER STEERING ECU BRACKET (See INSTALLATION )
- CONNECT WATER HOSE (See INSTALLATION )
- INSTALL INVERTER RESERVE TANK SUB-ASSEMBLY (See INSTALLATION )
- CONNECT ENGINE ROOM WIRE NO.2 (See INSTALLATION )
- CONNECT CIRCUIT BREAKER SENSOR NO.1 (See INSTALLATION )
- INSTALL POWER STEERING ECU ASSEMBLY (See INSTALLATION )
- INSTALL INVERTER BRACKET NO.5 (See INSTALLATION )
- INSTALL AIR CLEANER W/RESONATER (See INSTALLATION )
- INSTALL AIR CLEANER CAP W/INLET (See INSTALLATION )
- REMOVE FRONT SUSPENSION BRACE SUB-ASSEMBLY UPPER CENTER (See INSTALLATION )
- INSTALL SERVICE PLUG GRIP (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- ADD HYBRID VEHICLE COOLANT (See REPLACEMENT , for P310 and REPLACEMENT , for Q211)
- ADD ENGINE COOLANT (See ON-VEHICLE INSPECTION )
- CHECK HYBRID VEHICLE COOLANT LEAKS
- INSPECT FOR COOLANT LEAK (See ON-VEHICLE INSPECTION )
- INSTALL ENGINE ROOM SIDE LH COVER NO.2 (See INSTALLATION )
- PERFORM INITIALIZATION (See INSTALLATION )