Inspection Procedure
WARNING: This page is about a different variant/trim than selected.
- Check transmission wire
PREPARATION:
Disconnect the transmission wire connector.
CHECK:
Measure resistance between SL of transmission wire and body ground.
OK:
- Resistance: 11 to 15 Ω at 20°C (68°F)
- NG: Go to 3
- OK: Go to next step
- Measure resistance between terminals SL of ECM and body ground.
PREPARATION:
- Connect the transmission wire connector.
- Disconnect the ECM connector.
CHECK:
Measure resistance between terminals SL of ECM connector and body ground.
OK:
- Resistance: 11 to 15 Ω at 20°C (68°F)
- NG: Repair or replace the harness or connector ( HOW TO USE THE DIAGNOSTIC CHART AND INSPECTION PROCEDURE ).
- OK: Replace the ECM.
- Check shift solenoid valve SL operation.
PREPARATION:
- Jack up the vehicle.
- Remove the oil pan.
- Remove the shift solenoid valve SL.
CHECK:
- Measure resistance between terminal SL of shift solenoid valve and solenoid body.
- Connect positive (+) lead to terminal of solenoid connector, negative (-) lead to solenoid body.
OK:
- (a) Resistance: 11 to 15 Ω at 20°C (68°F)
- (b) The shift solenoid valve SL makes operation noise.
- NG: Replace the shift solenoid valve SL.
- OK: Repair or replace the transmission wire ( ATF TEMPERATURE SENSOR ).