Diagnosis Procedure
Regarding Wiring Diagram information, refer to "WIRING DIAGRAM ".
- CHECK VDC OFF SWITCH
Perform the VDC OFF switch component inspection. Refer to "COMPONENT INSPECTION ".
Is the inspection result normal?
YES: GO TO 2
NO: Replace VDC OFF switch.
- CHECK VDC OFF SWITCH HARNESS
- Disconnect ABS actuator and electric unit (control unit) connector.
- Check continuity between ABS actuator and electric unit (control unit) connector E125 (A) terminal 38 and VDC OFF switch connector M253 (B) terminal 1.
ABS actuator and electric unit (control unit) VDC OFF switch Continuity Connector Terminal Connector Terminal E125 (A) 38 M253 (B) 1 Yes - Check continuity between ABS actuator and electric unit (control unit) connector E125 (A) terminal 38 and ground.
ABS actuator and electric unit (control unit) - Continuity Connector Terminal E125 (A) 38 Ground No Is the inspection result normal?
YES: GO TO 3
NO: Repair or replace harness.
- CHECK VDC OFF SWITCH GROUND
Check continuity between VDC OFF switch connector M253 terminal 2 and ground.
VDC OFF switch - Continuity Connector Terminal M253 2 Ground Yes Is the inspection result normal?
YES: GO TO 4
NO: Repair or replace harness.
- CHECK COMBINATION METER
Check if the indication and operation of combination meter are normal. Refer to "DIAGNOSIS DESCRIPTION ".
Is the inspection result normal?
YES: Replace ABS actuator and electric unit (control unit). Refer to "REMOVAL AND INSTALLATION ".
NO: Replace combination meter. Refer to "REMOVAL AND INSTALLATION ".