Inspection Procedure
- CHECK FUSE
- Check that continuity exists of DOME fuse.
- Check that continuity exists of GAUGE fuse.
- Check that continuity exists of AM1 fuse.
- NG: REPLACE FUSE
- OK: GO to Next step.
- INSPECT COMBINATION METER ASSY
- Check continuity.
- Disconnect the "C9" connector from combination meter assy.
- Check continuity between terminal C9-2 of combination meter assy connector and body ground.
OK: Continuity exists
- Check voltage.
- Disconnect the "C9" connector from combination meter assy.
- Measure voltage between terminal C9-5 of combination meter assy connector and body ground.
Voltage: 10 - 14 V
- Turn the ignition switch to ON.
- Measure voltage between terminal C9-4 of combination meter assy connector and body ground.
Voltage: 10 - 14 V
- NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
- OK: CHECK AND REPLACE COMBINATION METER ASSY
- Check continuity.