Inspection Procedure
- Check converter circuit . See CONVERTER CIRCUIT .
- Check voltage between terminal HTR0, of A/C amplifier and body ground.
PREPARATION: Remove the center cluster module control with connectors still connected.
Check
- Start engine.
- Set temperature control switch on "MAX WARM" position.
- Set blower switch on "HI" position.
- Turn light control switch to OFF.
- Turn defogger switch OFF.
- Check voltage between terminal HTR0 of A/C amplifier and body ground at each conditions, as shown in the chart. See Fig 2.
- Check HTR1 and HTR2 fuses.
PREPARATION: Remove the HTR1 and HTR2 fuses from engine room R/B NO.3.
Check: continuity of HTR1 and HTR2 fuses.
OK: Continuity exists.
- Check HTR1 and HTR2 relays.
PREPARATION: Remove the HTR1 and HTR2 relays from engine room relay block NO.3.
Check: continuity between each pair of terminals shown below of magnetic clutch relay. OK: See Fig 5.
PREPARATION: Apply battery positive (+) voltage between terminals 1 and 2.
Check: continuity between terminals 3 and 5. OK: Continuity exists.
- NG: Replace HTR1 and (or) HTR2 relay.
- OK: Go to step 5.
- Check harness and connector between A/C amplifier and HTR3 fuse
. See
HOW TO USE THE DIAGNOSTIC CHART AND INSPECTION
.
- NG: Check and replace harness and connector.
- OK: Check and replace A/C amplifier.
- Check PTC heater (Heater Radiator).
PREPARATION: Remove the heater radiator. See step 8) of AIR CONDITIONING UNIT DISASSEMBLY .
Check: continuity between terminals of PTC heater connector. OK: Continuity exists.
- NG: Replace heater radiator.
- OK: Check harness and connector between PTC heater and HTR3 relay, PTC heater and body ground. See HOW TO USE THE DIAGNOSTIC CHART AND INSPECTION .